|
22 March 2010
|
|
16 May 2009 |
Job Apllication in Dubai
CURRICULUM VITAE
EDWARD M. PELOBELLO
Contact Number ( Hochiminh, Vietnam) : CP # 0919453047
E-mail Address: wardpelo@rocketmail.com
edward_pelobello@hotmail.com
PERSONAL INFORMATION:
Date of Birth: May 12, 1970
Place of Birth: Quezon City, Philippines
Citizenship: Filipino
Religion: Catholic
Marital Status: Married
Home Address: Blk 8 Lot 30 Mariville Homes, Guitnang Bayan 2
San Mateo Rizal, Philippines 1850
Height: 5’ 5”
Weight: 170 lbs
Passport No: PP0833361
Place Issue: Manila
College: Technological Institute of the Philippines
Language: English & Tagalog
Mechanical Engineer by Profession
Objective: Capable of handling the site independently, ensure quality of the projects and
complete the project on required schedule.
Desired Job Position: Site Engineer
Desired Status: Full Time
Desired Salary: USD
Recent Project: Ca Mau 1 & 2 Heat Recovery Steam Generator and Structural Turbine
Building with a capacity capacity of 1500 MW located at
Ca Mau, Vietnam.
Recent Project Employment Status: Since from start of construction until completion.
WORK EXPERIENCED
A. Site Engineer, Quality Controll Engineer & Material Controlling Engr.
2006 October up to 2009 January
Poslilama Engineering & Construction Co., Ltd
Nhon Trach Industrial Zone Dong Nai Province, Vietnam
1 Assign as engineer for installation & construction of mechanical
works such as boiler casing and parts, piping materials and insulation,
steel structures, scaffolding installation and painting for Ca Mau 1 and
2 HRSG Combine Power Plant Project.
2 Coordinate to our main contractor for daily materials erection and
installation.
3 Coordinate to all sub contractors for implementation of daily site
works.
4 Initiate internal inspection and prepare documents before checking by
our client to each section that has already accomplished.
5 Assisting with the inspection of completed works and helping prepare
punch list.
6 Monitoring the start-up, testing, commissioning, and handover of the works.
7 Inspecting the construction of temporary and permanent works to ensure
compliance with the contract documents and approval shop drawings and
submittals.
8 Coordinate to assign warranty engineers to all installed and uninstalled
materials on site in able to meet the requirements
9 Coordinate to our safety engineers in all safety rules and regulation
before starting daily site works.
10 Observing site safety practices and the progress of work and report any
concerns.
11 Prepare method of statement on all additional and repair works before
the jobs take place.
12 Head of material controller department.
13 Expedites and coordinates to all assign engineer on-site for material
planning and scheduling.
14 In charge for inspection of materials based on drawing and
packing list requirements.
15 Supervise and evaluate on site condition to all materials erection and
installation of steel structures, piping, painting and insulation until
completion of Heat Recovery Steam Generator.
16 Estimates and checking shortage materials based on supply to overcome
construction delay.
17 Review erection schedules and related information and conform with
assign site supervisors to determine material requirements, to identify
overdue materials and to track materials.
18 Assign as project management engineer for technical report regarding
manpower mobilization and supervision, daily report on site
accomplishment, implementation on site rules and regulation to all
sub contractors, coordination in our main contractor to overcome
miscommunication especially in the peak of construction and other
reports base on construction demand.
19 In charge to all transportation equipments, which involve controlling
driver discipline, mobilization and reports in able to meet safety
travel.
20 Supervision of scaffoldings installation in able to meet safe working
condition.
21 Coordinate to all assign commissioning engineers on both electrical
mechanical area.
22 Prepare job duties and responsibility to all direct assign staff and sub
contractors for each department.
23 Other jobs as per site manager instructions.
B. Private Practice Sub – Contractor – 2003 up to 2006
1 Labor works contractor for various middle-end housing projects at
St. Monique Valais Housing located at Binangonan Rizal.
2 Labor works contractor for exhaust ventilation and airconditioning
system for Max’s Restaurant.
3 Prepare estimates and evaluation.
4 Responsible for project status and completion.
5 Project implementation.
6 Material management.
7 Implementation of plans based on the given specifications.
C. Site Engineer – July 1999 to January 2003
RB Soriano Construction
Lot 13 Blk 4 Lauren st. Simeona Village, Concepcion Marikina
City Philippines
1 In charge of project installation and supervision for plumbing, electrical,
fire protection and HVAC system including equipment and devices.
2 In charge of quality control for all site implementation including
specified materials, testing and commissioning.
3 In charge of project coordination with reference to implementation
of plans for smooth and effective site operation.
4 Conduct site meeting involving 4 system installation status to all sub
contractor’s including toolbox meeting for safety construction.
5 Direct reporting to project manager for all mechanical and electrical
installation status.
6 Prepare and coordinate to QA and QC all necessary submittal documents
requirements for approval.
7 Prepare completion work schedule including bar schedule.
8 Prepare M & E equipment and devices for completion of project including
tools and materials.
9 Other jobs as per instruction of site manager.
D. Quality Control Inspector (Lab Technician) July 26, 1996 to July 31, 1998
Saudi Refrigerators Manufacturing Company
P.O. Box 3115, Jeddah Saudi Arabia 21471
1 Conduct regular audit of finished product base on engineering
established test limits.
2 Conduct general performance and pull down test on all types of
refrigerator & development.
3 Conduct acceptance test of development parts such as compressor,
fan, motor, timer etc.
4 Analyze and help in the troubleshooting of encountered problem
affecting refrigerator system performance.
5 Assign as product development engineer of refrigerator testing.
E. Quality Control Inspector – October 17, 1994 to July 24, 1996
Automotive Technology Development Inc. Sanden
2305 Pasong Tamo Ext. Makati City
1 Reporting different problem encountered in production line such as
quality of product, machine condition , rejection of materials,
production process and others in able to meet the standard quality
production.
2 Evaluate production output as per quality standard of different section
such as; pipe assembly, packing area metal fabrication, computerized
numerical control and machining and painting.
SKILLS
Computer literate for desktop application such as MS Excel, MS Office,
MS Word, MS Project and MS Outlook
Word and Adobe Premiere. Networking such as Ethernets.
Management and Supervisory
Communication
Leadership
Interpersonal
Project Management
Negotiation Skills
Time Management
Problem Solving
Thinking Creativity
References:
Mr. Oh Sung Guen Manager Poslilama E & C, Vietnam
Mobile # +84903337771
Mr Romeo Sigua Manager Architype, Vietnam
Engr. Renato Flores Manager Vietnam Government
Mobile # +84909687179
I hereby certify that information appear in the curriculum vitae are true and correct to the best of my knowledge and belief.
Signed by:
Edward M. Pelobello
Mechanical Engineer
phone:+84919453047
|
|
Post new ads
Disclaimer: Dubai-BB.com or Dubai Bulletin Board is a free online Dubai Classifieds website open to the public, so anyone can post their advertisements here. The Administration of Dubai Bulletin Board is not responsible for the content of ads placed here. We can't check how accurate is the information in the ads so while using it precaution is never out of place.
© 2007-2009 Dubai Bulletin Board | Privacy policy |
|