Mep Sr Projects Manager Projects Director in Dubai

From: Ashish Kumar Misra
Mobile: 00XXXEXPIREDXXXXXXEXPIREDXXX
Email: XXXEXPIREDXXX, XXXEXPIREDXXX


Application for the post of MEP- Sr Projects Manager / Projects Director with 21+ years of experience in MEP WORKS (18+ years out of India + 3 years in India)

Dear Sir,

With reference to above, I wish to offer myself as one of the candidate for the post mention above. My present job responsibilities and capabilities are in the Planning, Execution, Testing and Commissioning of MEP Projects, which involves Plumbing, Drainage, HVAC, Fire Fighting, Electrical and ELV Systems.

Plumbing and Drainage involves underground and above ground water and drainage lines with valve chambers and sewage manholes, Sewage Pumping manholes stations, domestic / irrigation water pump rooms, R.O Plant, Solar Plant, filtration system and installation of sanitary ware fixtures and fittings etc.

HVAC Systems involves installation of ducting (GI & Pre-insulated) with complete accessories, all type of A/C units (DX types and chilled water types), and all type of exhaust fans. Underground / above ground chilled water / condensing water pipelines with all accessories which includes installation of water and air cool chiller plant with all equipment’s and piping installations, cooling tower, cold storage etc.

Fire Fighting Services involves installation of GI piping, sprinklers head all type, fire hose reel with cabinets, fire hydrant, fire extinguisher, breeching inlets, fire hose rack with landing valve, zone control valve assembly, fire fighting pump room set, FM-200 in Electrical substation, pre action sprinkler system in lift machine room, foam agent system in diesel generator room and deluge system etc.

Electrical Services involves installation of primary cabinets, MCC, MCP, MCCP, DB S , EMDB S, Transformers, Lighting fixtures (external and internal), Lightning Protection, Bus bars, cable trunking, wiring with all accessories, lightning controls, cable trays, ladders and earthing system etc.

ELV systems involves installation of CCTV, SMATV, PAVA, fire alarm, Access Controls, Gate barriers, Structure cabling, BMS / BAS , Central battery / UPS, etc.

I am an approved engineer by the Dubai Municipality for the above services in their projects.

Experience in Projects Management / Coordination, Project Planning / scheduling, Estimation, Contracts and sub contracts (Subcontractors) finalization.

I had earlier experience in Plant Piping, Pipelines, Tanks, Structural Works, Equipment’s Erection, Painting, Blasting, Cathodes Protection, Wrapping-Coating, Welding, Preheating, PWHT, Refractory Insulation, Hydro testing, Air Blowing, Pigging, Vacuum test. Monitor NDT activities, such as RT, UT, MP and DP TESTS. Preparation of WPS, WPQT (PQR), WQT procedures etc. QC records preparations & preparation of final Dossiers etc.

I am also enclosing, below, my detailed Resume for your consideration please. I hope to hear a favourable response at your earliest convenience from your good office.

Thanking you

Yours faithfully


(Ashish Kumar Misra)

CURRICULUM VITAE


NAME Ashish Kumar Misra
FATHER’S NAME Mr C K Misra
DATE OF BIRTH 2XXXEXPIREDXXX
PASSPORT NO G 7688435, Indian
UAE DRIVING LICENCE Valid up to – Y 2024
LANGUAGE KNOWN Hindi / English
MARITAL STATUS Married
MOBILE 00XXXEXPIREDXXX5
EMAIL XXXEXPIREDXXX, XXXEXPIREDXXX


ACADEMIC QUALIFICATION

 Higher Secondary School (10+2) in 1992 from Kendriya Vidyalaya Mathura, Securing
First Division with Distinction.

PROFESSIONAL QUALIFICATIONS

 Bachelor of Engineering - Mechanical in 1996 from MIT- Manipal Institute of Technology- Manipal, Securing First Division with Distinction.
 MBA - Marketing from IMT Ghaziabad.
 Diploma in Materials Management from AIIMS Madras.

EXTRA / ADDITIONAL QUALIFICATIONS

 Done Certificate course in Project Management using Primavera Project Planner, Version (P3) as Professional tool.
 Done certificate course in Piping Engineering Design Course (CEASER-11) at CAD Centre, IIT Bombay (Powai)
 Done certificate course in AUTO CAD from MIT Manipal.
 Done certificate course in NDT, ASNT LEVEL 11, in RT.
 Done certificate course in Introvalve Penstocks and Flow Control equipment’s at m/s Hepworth PME LLC Training School in Dubai.
 Well conversant with Computer Knowledge, Microsoft Excel and Word star, Planning packages for projects (MS Projects).




JOB RESPONSIBILITIES

 Contract review & job cost analysis.
 Preparation of project planning schedules with manpower projections and cash flows.
 Reviewing of all quality control documents related to the projects.
 Planning and execution of all day to day activities.
 Coordination with all services and agencies involved.
 Attend all technical Meetings with Consultants, Clients, Main Contractor and coordinate
works with other trades.
 Control and delegate work to subordinates staff.
 Daily site coordination meetings with subordinates in order to evaluate and plan for on going
and upcoming activities, resolve any unforeseen problems, evaluate progress and quality
of work on a daily basis.
 Review the Shop Drawing and Material Submittal Plan.
 Review the project execution plan.
 Review and ensure that company procedures are being implemented.
 Carry out daily site visits to monitor progress and performance & notify deficiencies.
 Improve the QHSE implementation at each site in liaison with the concerned personal.
 Compile monthly evaluation claims.
 Responsible to ensure document control, communication protocol and that information
transmission is enforced as per company procedures.
 Responsible to monitor and control inventory on site.
 Responsible to handle disciplinary issues on site.
WORK EXPERIENCE [Total 21+ YEARS]


1) Working as Senior Projects Manager-MEP in M/s united masters LLC in Dubai (M/s ECC group of companies), since 9th Feb 2015 till date.


a) G+4 JVT school in jumeirah village triangle, M/s GAJ LLC as consultant, M/s FORTES/EDUTECH holdings LLC as client, M/s ABM LLC as Main contractor, total built up area 45000 SQ meters.
b) Talah board factory in khalifa port and industrial zone, M/s Talah board as client, M/s GREEN consulting as consultant, M/s Cemento Engineering Contracting LLC as main contractor (M/s ECC group of companies).


2) Worked as Senior Projects Manager-MEP in M/s Albonian international LLC in Dubai, from 21st may 2012 to 31st Dec 2014.


a) G+4 staff housing (four seasons hotel LLC) in Jabelali, M/s DXB LAB LLC as consultant, M/s bright star LLC as client, M/s DCC LLC as Main contractor, M/s HH LLC as project management consultant.
b) Luxurious Villas / palace compound in different location of Dubai such as Jumeriah, palm
Jumeriah etc. client as M/s HH investments and developments / Siddiqi sons’
investment.


3) Worked as MEP Manager in M/s SEG Societe d’Entreprise & de Gestion in Abudhabi, UAE from
21st Aug 2011 to 30th April 2012.

a) Junabi tower and Al-Hababi tower, 3B+G+M+12 FLOORS with M/s KEO LLC as Consultant.


4) Worked as Project Manager-MEP in M/s Arabian MEP Contracting(Al Malki Group of companies)
in Doha Qatar from 28th April 2010 to 31st July 2011.

a) New Arrival Terminal (ATB), Air Port Project, looked after all MEP activities for
The Airport Terminal Project with M/s Qatar Airway s as client and M/s GHD as
Consultant.
b) Supply and installation of air-conditioning & refrigeration units at Doha & Dukan in various projects with M/s QP as client.


5) Worked as Project Manager-MEP in M/s ETA M& E Division LLC in Dubai from 6th Oct 2006 to 31st
march 2010.

a) Dubai Metro Project looked after all MEP activities for the stations, with M/s RTA as Client and M/s WS Atkins, M/s Parsons / Systra as Consultants.
b) P & L Ware house, Emirates Airlines Storage at Quasis Dubai, with M/s Emirates as Client and M/s CDC as Consultant.
c) Proposed Commercial Hotel Apartments Building 2B+G+M+7 FLOORS at Dera
Muteena Dubai, with M/s Alghurair investment as Client and M/s Arif & Bintoak as Consultant.


6) Worked as Senior Project Engineer Mechanical in M/s a&p Paraskevaides & partners L.L.C.
(Electrical & Mechanical Engineering Contractors) from 4th Oct 2003 to 30th Sep 2006.

a) HAMMAD HOSPITAL at Doha Qatar with M/s AEB as Consultant.
Works involved Planning, Execution, Testing and Commissioning of HVAC Systems,
Drainage, Plumbing and Fire Fighting Services.
b) Zabeel Park at Dubai with M/s WS Atkins’s as consultant and Dubai municipality
as Client. Works involved Planning, Execution, Testing and Commissioning of HVAC
Systems, Drainage, Plumbing and Fire Fighting Services.

7) Worked as Project Mechanical Engineer in M/s Volta s International UAE from 16th Sep 2002 to
30th Sept 2003.


a) EPH (Emirates Palace Hotel) at Abu-Dhabi. With M/S Keo and M/S Turner as
Consultants.
Total Mechanical work involves Planning, Execution, Testing and Commissioning of
Chiller Plant i.e. Installation of Complete HVAC System, Plumbing, Drainage, Chilled
Water / Condensate Water piping underground and above ground, Erection of all
Equipment’s with Chillers, Installation of Cooling tower.


8) Worked as Project Mechanical Engineer in M/s Sumatec Corporation SDN. BHD. (Head Office
based at selangor D.E.Malaysia) in Construction field from 22nd Dec 1999 to 31st August 2002.

a) Joint Consortium with M/s Petrofac International ltd, for M/s GNPOC (Greater Nile Petroleum Operating Company) and M/s OGP Technical Services SDN BHD as Consultant at Munga Oil Fields in Sudan, from 1st July 2000 to 31st August 2002.
Total Mechanical work Involves, Planning, Execution, Testing and Commissioning of
Drainage, Plumbing, HVAC system, Fire Fighting Services, for Infrastructure
Development, Residential / Industrial Projects facilities etc.
b) Male’ International Airport Fuel Storage Expansion and Upgrading, Was Posted
in Republic of Maldives from 22nd Dec 1999 to 21st June 2000.
Total Mechanical work Involves, Planning, Execution, Testing and Commissioning of
Drainage, Plumbing, Fire Fighting Services, for Infrastructure Development of Airport
Fuel Storage tank farm area etc.


9) Worked as Mechanical Engineer in M/s Punj Lloyd Ltd in construction field from 1st august 1996 to
15th Dec 1999 was posted in India.

a) Mathura Refinery Project in Hydro cracker Unit.
Executed the Fabrication and Erection of Piping Works (CS, AS, SS, IBR CS) and all other related
activities involving the piping works. Dealing and Handling of all Designing Aspects of Piping,
Providing the Solution at site itself etc.
b) Panipat Refinery Project in Hydro cracker / Hydrogen Generation Unit.
Executed the fabrication and Erection of Piping. Executed the Fabrication and Erection
Work of OHCU HEATER, the work involved Support Structures, Columns, Frames,
Refractory Insulation Stacks, Coiling etc. Executed the Fabrication and Erection work of
Reactor and Regenerator in Hydro Cracker Unit, having plate thickness of around
180mm, work involving M.P test, D.P test, Radiography, Submerged ARC welding, MIG
Welding, Preheating, Hydro testing, Post weld heat treatment etc.







DATE:

PLACE: (Ashish Kumar Misra)


Phone: XXXEXPIREDXXX